To Develop, implement and maintain an IT tool for implementing the phase-II of MNRE
RTPV scheme and Gujarat Government Schemes for RTPV installations in the
domestic/residential category
|
MNRE has recently announced the Phase-II of the grid connected solar rooftop PV scheme where
the subsidy is available only for the domestic category consumers and the beneficiaries will be given
subsidy of 40% up to 3KW and subsidy of 20% for system of 3 to 10 KW. The guidelines for
implementation of the scheme are under preparation and will be announced very soon.
Quote from the budget announcement speech “The benefit of solar rooftop scheme has been
availed by 50 thousand people till date. Under this scheme, people can install solar panels on the
roof of their houses and after using the solar power generated in this way, supply the surplus power
to the power grid. I am glad to inform this August House that I announce a new solar roof-top
scheme this year, whereby 2 lakh families will be covered during the year. Under this scheme,
beneficiaries will be given subsidy of 40% up to 3KW and subsidy of 20% for system of 3 to 10 KW.
Provision of `1000 cr for this scheme has been made during the current year.” Both these schemes
as discussed above shall be implemented through GUVNL, DGVCL, MGVCL, PGVCL, UGVCL and
both Discoms operated by Torrent Power. PGVCL under the guidance of GUVNL has floated a
tender for 600MW RTPV installations in the State of Gujarat by March 2020.
In order to make the process of interconnection more efficient and effective, several measures are
required to be taken. Along with capacity building of the field level staff of the licensee, it is also
important to support the entire process through information and technology.
German Development Cooperation (GIZ) in partnership with Ministry of New and Renewable Energy
(MNRE) is implementing Indo-German Solar partnership project (IGSP). Under this ToR GIZ aims to
develop, implement and maintain an IT tool for implementation of the schemes announced by MNRE
and the Government of Gujarat.:
- Replace the lengthy and cumbersome physical procedure with an efficient, effective and
online procedure for State Nodal Agency for undertaking the following steps
- interconnection with distribution network
- availing subsidy from the State Government and
- to take any other approval/ clearance
- Train / educate the staff of the distribution licensee(s) to support the implementation of
rooftop solar systems in their area
The detailed documentation with regards this call for proposals includes –
|
- Terms of Reference for the Assignment
- Grid for Assessing the Eligibility of Firms
- Technical Evaluation Grid
- Bidding Conditions
- General Terms & Conditions of Contracts
|
Timeline
: 19th August, 2019
: 26th August, 2019
: 29th August, 2019
: 6th September, 2019, by 17.30hrs