Project Category
Project Category
Postal, Mobile, and Telecom Industries
Project Description
Project Description
Promoter: Airports Authority Of IndiaProject Name: ATC Tower-cum-technical Block In KolkataProject Type: New UnitStatus: Planning StageDistrict: KolkataLocation: Kolkata AirportLand: 3||Acres|Product-Capacity: ATC tower-cum-technical blockCurrent Status: As of September 2014, the authority has announced that a tender will be floated for the project within 2 months. The revised estimated cost for the project is Rs. 2.3 billion from Rs. 2 billion. The authority board would approve the revised project at its next meeting. The block will come up besides the administrative building of the airport & next to the integrated terminal opened in 2013. But the floor area of the technical block will be a little larger than what was decided earlier. The tower will be 80 mtrs. high and it will be mounted on a 4-storied technical block. The work for the project would commence in the next 6 months and the target was to complete the construction work by end 2017. After this, the authority will require another 6 months for trans-installation of the equipment from the existing ATC tower to the new facility.An 80 mtrs. tall tower with a 360-degree view would replace the 60-year-old air traffic control (ATC) building at Kolkata airport in 2018. The tower would house a 5-storey technical block. 9 new radars have been set up in Kolkata`s flight information region to facilitate automation of the air traffic management (ATM) and CNS systems at the city airport. The authority will install internet protocol-based radio and voice communication systems. Several transmitters and receivers are being installed already this would improve voice communication between pilots and ATC personnel. Promoter: Airports Authority Of IndiaProject Name: ATC Tower-cum-technical Block In KolkataProject Type: New UnitStatus: Planning StageDistrict: KolkataLocation: Kolkata AirportLand: 3||Acres|Product-Capacity: ATC tower-cum-technical blockCurrent Status: As of September 2014, the authority has announced that a tender will be floated for the project within 2 months. The revised estimated cost for the project is Rs. 2.3 billion from Rs. 2 billion. The authority board would approve the revised project at its next meeting. The block will come up besides the administrative building of the airport & next to the integrated terminal opened in 2013. But the floor area of the technical block will be a little larger than what was decided earlier. The tower will be 80 mtrs. high and it will be mounted on a 4-storied technical block. The work for the project would commence in the next 6 months and the target was to complete the construction work by end 2017. After this, the authority will require another 6 months for trans-installation of the equipment from the existing ATC tower to the new facility.An 80 mtrs. tall tower with a 360-degree view would replace the 60-year-old air traffic control (ATC) building at Kolkata airport in 2018. The tower would house a 5-storey technical block. 9 new radars have been set up in Kolkata`s flight information region to facilitate automation of the air traffic management (ATM) and CNS systems at the city airport. The authority will install internet protocol-based radio and voice communication systems. Several transmitters and receivers are being installed already this would improve voice communication between pilots and ATC personnel. Promoter: Airports Authority Of IndiaProject Name: ATC Tower-cum-technical Block In KolkataProject Type: New UnitStatus: Planning StageDistrict: KolkataLocation: Kolkata AirportLand: 3||Acres|Product-Capacity: ATC tower-cum-technical blockCurrent Status: As of September 2014, the authority has announced that a tender will be floated for the project within 2 months. The revised estimated cost for the project is Rs. 2.3 billion from Rs. 2 billion. The authority board would approve the revised project at its next meeting. The block will come up besides the administrative building of the airport & next to the integrated terminal opened in 2013. But the floor area of the technical block will be a little larger than what was decided earlier. The tower will be 80 mtrs. high and it will be mounted on a 4-storied technical block. The work for the project would commence in the next 6 months and the target was to complete the construction work by end 2017. After this, the authority will require another 6 months for trans-installation of the equipment from the existing ATC tower to the new facility.An 80 mtrs. tall tower with a 360-degree view would replace the 60-year-old air traffic control (ATC) building at Kolkata airport in 2018. The tower would house a 5-storey technical block. 9 new radars have been set up in Kolkata`s flight information region to facilitate automation of the air traffic management (ATM) and CNS systems at the city airport. The authority will install internet protocol-based radio and voice communication systems. Several transmitters and receivers are being installed already this would improve voice communication between pilots and ATC personnel. Promoter: Airports Authority Of IndiaProject Name: ATC Tower-cum-technical Block In KolkataProject Type: New UnitStatus: Planning StageDistrict: KolkataLocation: Kolkata AirportLand: 3||Acres|Product-Capacity: ATC tower-cum-technical blockCurrent Status: As of September 2014, the authority has announced that a tender will be floated for the project within 2 months. The revised estimated cost for the proj
Country
Country
India \ West Bengal
Our Reference Number
Our Reference Number
2008718140924
 
Free TendersNew Member ? Register Here To Get Tender Alerts In Your Mailbox.
(*) Means the box must be filled in before sending
Valid E-mail*:   
*
Confirm E-mail*:   
Your Name*:   
Company Name*:   
Designation*:   
Company Address*:   
Country*:   
State*:   
Mobile No.*:   
Land Line No. :   
Skype ID:   
Official Website :   
Are You Interested In New Projects Information:   
How did you find us:   
Products / Service*
Product / service names should be comma separated maximum 150 Characters
I agree to receive tender alerts, newsletters, reminders from tendernews.com by email,phone,sms.
I agree to the terms & conditions and request for free Registration.