CONSTRUCTION OF 4 UNITS TYPE-III QUARTERS, 3 UNITS TYPE-II QUARTERS, OFFICE ACCOMMODATION FOR AEE/____ AT ____ TEMPORARY ACCOMMODATIONS AT ____ & OTHER ALLIED WORKS IN CONNECTION WITH ____ – ____ NEW B.G. RAIL LINK PROJECT.
DESIGN , ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE ON BUILD , OPERATE AND TRANSFER ( BOT ) BASIS OF FOLLOWING WORKS BHURIA - NAINAWALI ROADS INCLUDING OTHER ASSOCIATED LINKS ( TOTAL LENGTH 32.83 KM ) AND YAMUNA NAGAR - LADWA - PIPLI & KARNAL - LADWA RAODS ( TOTAL LENGTH 73.97 KM ) ( PACKAGE NO HRPWD/ BOT-2&3)
CONSTRUCTION OF 23 UNITS TYPE-I, 14 UNITS TYPE-II, 7 UNITS TYPE-III & 4 UNITS TYPE-IV QUARTERS, RPF BARRACKS AND OTHER ALLIED WORKS SUCH AS DRAINS, ROAD WORK, BREAST WALL ETC, AT ___ RAILWAY STATION IN CONNECTION WITH ___ – ___ NEW B.G. RAIL LINK.
CONSTRUCTION OF RAILWAY PORTION OF ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NO. C-161 AT KM. 343/15-17 ON ___- ___ SECTION NEAR ___ RAILWAY STATION OF N.RLY.
CONSTRUCTION OF RAILWAY BRIDGE NO. 26 (SPAN 1X6.0X7.20M, RCC BOX TYPE) AT KM.47.852 OVER ___ - ___ ROAD AND OTHER BRIDGES INCLUDING CONSTRUCTION OF WING WALL, RETAINING WALL, SIDE DRAINS AND OTHER ALLIED WORKS AND ADDITIONAL EARTHWORK IN FILLING IN FORMATION/TROLLEY REFUGES BETWEEN KM.47.200 TO KM.48.500 IN PUNJAB AREA IN CONNECTION WITH ___ – ___ NEW B.G. RAIL LINK PROJECT.
CONSTRUCTION OF WELL FOUNDATION AND RCC SUB-STRUCTURE FOR 2X45.7M+1X30.5M SPAN BRIDGE OVER ____ CANAL AT KM.87.732, ROAD UNDER BRIDGE NO.25 OF SIZE 2X9.25X5.75M RCC BOX ON ___-____ ROAD, 4X1200 MM DIA RCC HUME PIPE BRIDGE NO.29-AA & OTHER ALLIED WORKS IN CONNECTION WITH ___ – ___ NEW B.G. RAIL LINK PROJECT.
CONSTRUCTION OF TOWER WAGON AT MRND, FEEDING POST (FP) NEAR LOCATION NO. 21/10-11 AT MRND, SUB SECTIONING & PARRELLING POST (SSP) AT KM.11/485 AT MOHALI AND SECTIONING & PARRELLING POST (SP) AT KM.26.953 AT KHARAR AND OTHER ALLIED WORKS IN CONNECTION WITH ____ – ____ NEW B.G. RAIL LINK PROJECT
CONSTRUCTION OF 20 NOS ADDITIONAL SUITES IN SOS MESS I/C INTERNAL WATER SUPPLY, SANITARY INSTALLATIONS, DRAINAGE AND DEVELOPMENT WORKS AT CRPF CAMPUS, HALLOMAJRA, ___
CONSTRUCTION OF TOWER WAGON AT MRND, FEEDING POST (FP) NEAR LOCATION NO. 21/10-11 AT MRND, SUB SECTIONING & PARRELLING POST (SSP) AT KM.11/485 AT ___ AND SECTIONING & PARRELLING POST (SP) AT KM.26.953 AT ____ AND OTHER ALLIED WORKS IN CONNECTION WITH ____ NEW B.G. RAIL LINK PROJECT
We also offer facility of payment through net banking from following banks
ABN AMRO Bank, Axis Bank, Canara Bank, Centurion Bank, Citibank, Corporation Bank, Federal Bank, HDFC Bank, ICICI Bank, IDBI Bank, Induslnd Bank, J & K Bank, Kotak Mahindra Bank, Oriental Bank of Commerce, Punjab National Bank, The Bank of Rajasthan, Union Bank of India, Yes Bank, State Bank of India