Records Found:214 [Page 1 Of 11]
Ref No Posting Date Deadline Short Description
1240118170218 18-Feb-2017 23-Feb-2017 m.o.e.i and rmo compound light, sub station equipments in the general pool residential complex at
1177318170218 18-Feb-2017 24-Feb-2017 execution of works under s. r. (plan) to repairing of plinth protection of coronation throne
1127518170218 18-Feb-2017 06-Mar-2017 supply and installation of whole body digital colour doppler system (usg machine)
1127418170218 18-Feb-2017 28-Feb-2017 providing of services for operation monitoring of generating units of power house gis aps top and
1127318170218 18-Feb-2017 16-Mar-2017 purchase of 2(two) no. multi utility vehicles
1126518170218 18-Feb-2017 03-Mar-2017 repair of old public toilets and construction of new public toilets at vicinity
1029618170218 18-Feb-2017 25-Feb-2017 provn of kitchen washing pt in bldg t 19 jco s mess at burdong and spl repairs to toilet block of
367052170218 18-Feb-2017 06-Mar-2017 supply and installation of whole body digital colour doppler system (usg machine)
365052170218 18-Feb-2017 10-Mar-2017 purchase of laptop
22118170218 18-Feb-2017 18-Feb-2017 setting up of ptp wireless network solution
1664916170217 17-Feb-2017 05-Mar-2017 construction of boundary wall and gate complex for township area of ntpc # rammam hydro power proj
1664516170217 17-Feb-2017 05-Mar-2017 construction of sajbotey school under cd scheme
1664416170217 17-Feb-2017 05-Mar-2017 construction of quality laboratory building for ntpc # hydro power project
1664316170217 17-Feb-2017 05-Mar-2017 construction of school at nezi under cd scheme
1644916170217 17-Feb-2017 04-Mar-2017 supply of library server
1461016170217 17-Feb-2017 24-Feb-2017 for the items- pre painted galvalume sheet, ms bar, brick hammer product code 29 tata(agro) with h
1013716170217 17-Feb-2017 15-Mar-2017 enlistment for regular contract works and services
516316170217 17-Feb-2017 22-Feb-2017 various supply items pvc copper cable 1 sqmm, cable pvc insulated aluminium, led bulb 20w, led lig
490218170217 17-Feb-2017 07-Mar-2017 supply, installation, testing and commissioning of 10 kva online ups with battery bank for 3 hours
74618170217 17-Feb-2017 04-Mar-2017 isi certificate for material of furniture.
  1  2  3  4  5  6  7  8  9  10  Next  Last