Search Tenders

digital signature Tenders

Ref No Posting Date Deadline Location Short Description
512618180716 16-Jul-2018 28-Jul-2018 India / WEST BENGAL Construction of three (03) Nos. Air X ings at 30dip/40L & 31dip/40L for re-organization of ventila
512718180716 16-Jul-2018 28-Jul-2018 India / WEST BENGAL Construction of 04 Nos. Sec. Stoppings and 03 Nos. of door jamming at B7(B) caving panel in R-VI (
512818180716 16-Jul-2018 28-Jul-2018 India / WEST BENGAL Construction of support wall & side wall 46L/12D-13D, 12D/46L-47L, 46L/12D-11D, 11D/46L-47L and 47
512918180716 16-Jul-2018 30-Jul-2018 India / WEST BENGAL Installation and commissioning of 1200 mm x 950 Mtr Long Steel Cord Belt Conveyor system complete
779716180716 16-Jul-2018 26-Jul-2018 India / WEST BENGAL Drilling of 02 nos of 4 inch dia upward borehole from R-VII to R-IX seam and drilling of 01 no. of
779816180716 16-Jul-2018 26-Jul-2018 India / WEST BENGAL Side bolting with wire netting along the travelling roadways nearby gallery of CM depillaring pane
779916180716 16-Jul-2018 26-Jul-2018 India / WEST BENGAL One time advance roof support by roof bolting at stowing panel R-VIIA/1 at no. 8 pit
780016180716 16-Jul-2018 26-Jul-2018 India / WEST BENGAL Cleaning of carbonaceous materials mixed with stone at Kumardihi B Colliery.
780116180716 16-Jul-2018 26-Jul-2018 India / WEST BENGAL Construction of 4 (Four) nos of 1.0 m thick sectionalisation stopping in R-V seam
780216180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Repairing of boundary wall of 2 no incline at KN Section at Gopinathpur Colliery.
780316180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Construction of transformer shed and PCC work at Electric sub-station complex at Mohul Bagan Colon
780416180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Construction of FRC road from Kalimati tippler to Fan house
780516180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Illegal mine filling with earth at Khudia River side
780616180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Construction of transformer room, switch room and boundary wall in substation at Nirsa Colliery
780716180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Construction of coal depot boundary wall under Chapapur Colliery.
780816180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Illegal mine filling with earth near Kantabon and Adarsh colony
780916180716 16-Jul-2018 30-Jul-2018 India / JHARKHAND Construction of boundary wall front and back side of B and C type quarter
781116180716 16-Jul-2018 02-Aug-2018 India / WEST BENGAL Heightening of roof by cutting of stone / coal for making proposed beltline for underground bunker
781216180716 16-Jul-2018 24-Jul-2018 India / WEST BENGAL Cleaning and removing conservancy garbage mixed with rubbish in drain at Neamatpur Central Worksho
781416180716 16-Jul-2018 31-Jul-2018 India / WEST BENGAL Filling of illegal mining in Borachak( R-VIII) seam at Chinakuri Mine-3 at Bejdih Mouza in the lea

» Our Top Clients