Construction of Bituminous Ring road at OCS-04 of length 350.00M, by jungle cutting both side, dressing & levelling both side of the approach road, supply & filling earth for construction of shoulder, 150 mm thick GSB, 75mm thick WBM (two layer), applying prime coat, tack coat & 40 MM thick SDBC including supply of all materials.